Full Freeway Closures This Weekend

The California Department of Transportation (Caltrans) will conduct an extended closure this weekend on the northbound and southbound Long Beach Freeway (I-710) from the Artesia Freeway (SR-91) to the San Diego Freeway (I-405). The work is part of the Long Life Pavement Rehabilitation Project from the I-405 to Firestone Boulevard.

FULL FREEWAY CLOSURE

Northbound and Southbound I-710 from SR-91 to I-405

1) Saturday, June 27, 2009, 12:01 a.m. to 6:00 a.m.

2) Sunday, June 28, 2009, 11:00 p.m. to Monday, June 29, 2009, 5:00 a.m.

CLOSED RAMPS:

Northbound I-710 on-ramps at Long Beach Boulevard and Del Amo Boulevard

Southbound I-710 off-ramps at Long Beach Boulevard, Del Amo Boulevard, and Artesia Boulevard

CLOSED FREEWAY CONNECTORS:

Northbound and southbound I-405 to northbound I-710

Eastbound and westbound SR-91 to southbound I-710

Beginning Saturday at 6:00 a.m. until Sunday 11:00 p.m., a reduced number of lanes on northbound I-710 will be open to motorists. All traffic will flow in northbound I-710 lanes while construction continues in southbound I-710 lanes throughout the weekend.

Vehicle speeds will be reduced to 45 mph in the construction zone. Oversized loads are not permitted throughout the weekend due to narrower lane widths. To decrease delay time, motorists are advised to use alternate routes around the project area.

The work involves rehabilitating aging pavement to provide a roadway with several decades of service life, improved pavement performance and a smoother ride for the traveling public. Nine miles of pavement is being replaced with 10″ inches of Long Life Asphalt Concrete. Roadway widening will occur where possible to provide standard lanes and shoulder widths. Since the construction began in October 2008, Caltrans has completed pavement replacement on northbound and southbound I-710 between SR-91 and I-105.

More information on the Long Life Pavement Rehabilitation Project is available on the Caltrans District 7 website at www.dot.ca.gov/dist07